Location
Lombardy, Italy
Year
2025
Job
Switchboards and distribution
The work
New machinery had outgrown the old switchboard, and every trip of a protective device stopped the whole production.
We built a main switchboard and sub-boards for each area, with selective protection, power factor correction and up-to-date diagrams. A fault now stays limited to a single line.
Gallery



