Location
Ouagadougou, Burkina Faso
Year
2026
Job
Solar and storage
The work
Frequent grid outages stopped work and forced the use of a generator. The goal was to cut costs and keep essential loads powered.
We installed solar modules, a hybrid inverter and battery storage, with a dedicated circuit for priority loads and remote monitoring.
Gallery



